Grab assembly on site
Many grabs are too big to transport fully assembled and are transported in main parts. Assembly on site is relative easy, with or without the assistance of a Verstegen engineer.
Transport in main parts
Sometimes grabs are too big to be transported in one piece and it is easier to transport the grab in main parts. In this way transport costs can be reduced.
In these cases the grabs have to be assembled on site.
Together with the grab, Verstegen delivers very clear assembly instructions with step-by-step drawings.
When required, we can also send an engineer to assist with the assembly. The assembly of a grab normally takes between 4 and 8 hours.